CRIT SESSION:
2/11 (Monday)
1. Introduction:
- Meet up session with the studio masters with all the group members.
2. Site analysis:
- Discussion on how does every department did their task at the site, Taiping Lake Garden.
- Every department give a brief to the studio master all the information that had been collected during the site analysis.
- Additional information regarding to the site analysis.
- Meeting among the group members
- Distribution of the tasks.
6/11 (Friday)
1. Site analysis presentation:
- Planners did a presentation to the studio master about their site analysis and also the key plan and also the idea on the project of the pavilion.
- Studio master did came out on the problem will arise in the future and also to think wider on the site analysis.
2. Design Presentation:
- The design department came out with all the three design which represent different concept.
- All the designers (Architecture) have the question and answer session with the studio masters and also all the students of group 3 (3a and 3b).
Problem Arisen:
- Justification and also explanation on every aspect. ex: design
- Site analysis have to discover area of surrounding on the site, not only the site.
- Improvement on the presentation skills.
20/11 (Friday)
1. Design Presentation
- Design department give a briefing to the studio master regarding to the design that had been chosen on the previous presentation (Final design)
- Building technolgy and also quantity surveyer also touch regarding to the foundation and also material selection.
Problem arisen:
- Presentation flow and also the organization.
- Building tech presentatation regarding to the foundation, walls and roof.
- Costing and also material selection detailing.
- Foundation dimension.
27/11 (Friday)
Working Progress
- Proceed with all the project work before the submission deadline.
- Organization on the A1 board.
Problem arisen:
- Oganization on the A1
- work prospect and final product.